The platform — for customers, design teams & factories

The Standard isn’t a promise. It’s enforced by software.

Watch the portal assemble itself — then run one project, upload to delivered. Scroll.

One system — real interface, demo data

First it assembles.
Then it delivers.

Keep scrolling —

app.atelier.inc
— PROJECT HOME  ·  WELCOME BACK, SOFIASign out   SG Sofia Grant

The Cove Hotel — Miami Beach

COVE HOSPITALITY GROUP  ·  AT-MIA-2026-0158  ·  MIAMI BEACH, FL
●  IN PRODUCTION
PROJECT INFORMATION
ClientCove Hospitality Group
Address2301 Collins Ave, Miami Beach
Project #AT-MIA-2026-0158
Milestone5 / 8
Items46 total
Target deliveryNov 14, 2026
AT Atelier Production Team
ITEMS COMPLETE28 /46
PHASE5 of 8
DAYS TO DELIVERY49
OPEN APPROVALS3
▣Project StatusON TRACKIN PRODUCTIONSYNC CALENDAR62%
UploadedIn reviewQuoteContractIn productionNOWQCShippingDeliveredNOV 14
Project health: On Track  ·  Next milestone: Guest room casegoods — QC gate, Oct 8  ·  Target delivery Nov 14, 2026
Scrubbing the project — upload → delivered
Under the hood — the same system, every project
01 — Qualify

Suppliers work inside the system.

Every job arrives engineered — DFM, shop drawings and tolerances resolved by Atelier upstream, so suppliers build to released revisions, never interpretations. Milestones, capacity, track record — qualified, never “certified.”

app.atelier.inc
Factory workcenter — production milestones (demo data)
02 — Coordinate

Every stakeholder sees the current set.

Atelier’s engineering output — shop drawings, DFM, plan versions — coordinated in one place with full consultant visibility. Architect, designer, GC and client approve against the same engineered revision, and factories build only what was released. What arrives on site fits the job around it.

app.atelier.inc
Shop drawing set — revisions and approvals on record (demo data)
The Atelier Standard — the trust layer
LADDER

Suppliers earn their way in

Capability audit → records review → facility review → test package → provisional status → enhanced first-job monitoring → ongoing scorecards. Status is continuously earned — and can be lost.

GATES

Six QA gates on every project

Control samples → first article → in-process checkpoints → pre-shipment inspection → NCR & corrective action → closeout. Criteria set per project, per product.

“Qualified” — never “certified.” · real platform · demo data · no supplier directory, ever

See your project in it.