Manufacture — for owners, developers, GCs & design teams

From drawing set to installed product.

This page is your project’s life, top to bottom. Ten stages, one contract — your approval gates marked in orange. Scroll.

The 10-stage protocol 10 — gates in orange
Stage 01

Drawing set intake

Plans, elevations, details, specs and FF&E schedules enter a project data room with a project ID from day one.

Stage 02

Scope intelligence

The set is parsed into an item register — scope, quantities, materials and missing information identified.

Scope summary returned to you
Stage 03

Engineering & shop drawings

Atelier engineers every item in-house — DFM, tolerances, materials — before any factory sees the job. Submittal packages with markups, revision logs and release gates — every approval recorded against its revision.

Customer gate — submittal approval
Stage 04

Factory routing

Work is routed across the qualified network by capability, capacity, quality history, lead time and landed cost. You never manage a factory.

Stage 05

Shops + control samples

Physical control samples and first articles approved before production release — finish, joinery, tolerance.

Customer gate — sample approval
Stage 06

Production

Item and batch-level milestones with photographic evidence, dates and exceptions — visible as they happen.

Stage 07

Quality control

Project-specific inspection plans and pre-shipment inspection, attached to each item’s record.

Pre-shipment QC evidence returned
Stage 08

Logistics

Crate planning maps items to crate, floor and room. Consolidated freight, customs and site-readiness checks.

Stage 09

Installation

Sequenced delivery coordinated with your site — room by room, crate by crate. What arrives is what Atelier engineered and every stakeholder approved: the released revision, nothing else.

Customer gate — install sign-off
Stage 10

Warranty

Atelier-backed closeout — documentation and recourse live on the item record.

What Atelier assumes along the way
Engineering coordinationSupplier managementProductionQuality controlFreightInstall coordinationWarranty
S.01

Parallel routing

Categories run concurrently across the network — the schedule never queues behind one shop.

S.02

QC before freight

Problems are caught at the factory, not on site — nothing ships without pre-shipment inspection.

S.03

Recovery capacity

Qualified alternates stand behind every routing — capacity problems are re-routed, not renegotiated.

Ten stages. One signature. Your gates, on the record.